In a first phase, if the padel courts are located outside, it will be necessary to carry out earthworks over the entire surface of the grounds with the excavation of trenches for the construction of the peripheral stringers.
Once the earthworks have been completed (including the drainage circuit), a foundation of the reinforced concrete, fiber-reinforced or metal sill type will be created.
A porous concrete slab 9cm thick, standard NF P90-110 will then be made (including the external standardized clearance zone).
Before pouring the concrete, the reinforcement of the stringers and the electrical ducts for the lighting are placed in the trench.
Ten-year guarantee on all concrete structures.
Many additional options.
A single interlocutor
SLABS - SILLS
In a first phase, if the padel courts are located outside, it will be necessary to carry out earthworks over the entire surface of the grounds with the excavation of trenches for the construction of the peripheral stringers.
Once the earthwork has been completed (including the drainage circuit), a foundation of the reinforced concrete, fiber-reinforced or metal sill type will be created.
A porous concrete slab 9cm thick, standard NF P90-110 will then be made (including the external standardized clearance zone).
Before pouring the concrete, the reinforcement of the stringers and the electrical ducts for the lighting are placed in the trench.
Ten-year guarantee on all concrete structures.